How to Improve the Production Power of Concrete Mixing Plant
1. According to the production capacity of the concrete mixing plant for civil products and the distance, route and route conditions of finished product transportation, a sufficient number of transport vehicles should be equipped, generally recommended according to 1.2 times the production rate demand;
2. Factors affecting the productivity of concrete mixer equipment In addition to the mixing time and time utilization coefficient, they are the direct factors affecting the production and slaughter of asphalt concrete mixing equipment. In addition, there are many related factors, such as production organization, equipment management and operation quality, etc., among which the technical condition of equipment operation, raw materials and preparation of transportation vehicles also have significant effects on ensuring and improving productivity;
3. It is necessary to strengthen the repair and treatment of the equipment of the product concrete mixing plant, ensure that the equipment is in good technical condition, and meet the requirements of the environmental protection law, establish strict repair inspection rules and preventive measures, and achieve timely repair;
4. In order not to shut down the equipment of the product concrete mixing plant due to special factors, there should be a finished material storage bin with sufficient capacity;
5. Raw materials should be sampled and inspected. Aggregates of different specifications (including powder) should be piled up separately and protected from dust and rain. Asphalt should be heated in time to maintain a certain temperature. Aggregate storage is more than 5 times of the daily use denier, powder and asphalt storage is more than 2 times of the daily use;